Description

Description

Extension in new building with refurbishment done in two phases.

Phase A, done in Summer 1997 to link stages 3 and 4. An area of 3000 sq m costing ¿4 million.

Phase B, completed in Spring and Summer 1998, to alter stages 1-3 to enable a revised layout for the entire extended building. An area of 9000 sq m costing ¿2 million.

Awards

-

The Building

The Building

Type of library

-

Size

12000 m2

Floors

4

Architect

-

Building contractor

-

The Space

The Space

Features and services

Special services

-

External features

-

Internal features

-

Energy efficiency

-

Accessibility provision

-

Interior designer

-

Furniture suppliers

-

Services and facilities suppliers

-

IT provision

-

Seats/study places

1000

Stock

-